admin 管理员组

文章数量: 1087139


2024年12月28日发(作者:站酷下载素材流程)

TRANSCEND® SURESET™ GLUE DOWN LUXURY VINYL

INSTALLATION INSTRUCTIONS

INTRODUCTION

These instructions are written as a guide to be used when installing Tarkett Flooring. These instructions, combined with our adhesives and flooring

products, create a system. Utilizing this system will ease the installation process and provide the customer with a completed product that will perform to

its intended purpose. Always visit

for the most current installation and maintenance instructions. Technical videos and tip sheets are

also available. Contact Tarkett Technical Services at (800)-899-8916 with any questions.

GENERAL INFORMATION

1.

2.

3.

4.

5.

6.

7.

8.

9.

All Tarkett products must be stored in an indoor, climate-controlled space and be protected from the elements. Temperature must be

maintained between 65˚F (18.3˚C) and 85˚F (29.4˚C) with a relative humidity between 40% and 60 %.

Cartons must be stored horizontally on a sturdy base at all times.

Protect corners from damage.

Carefully check flooring material for any defects. Contact your supplier immediately if any defect is found.

Tarkett Flooring is intended for indoor use only.

Transcend SureSet must be acclimated in an indoor, climate-controlled space and be protected from the elements. Temperature must be

maintained between 65º F and 85º F (18.3° C -29.4° C) with a relative humidity 40% and 60% for 48 hours prior to the installation.

Room Temperature must be maintained between 65ºF and 85ºF (18.3°C – 29.4°C) with a relative humidity between 40% to 60% for 48 hours

before and during, and 48 hours after the installation.

Exposure to direct sunlight can result in Transcend SureSet fading and creates excessive heat directly on the finished flooring and surrounding

structure which may result in movement. During peak sunlight exposure, the use of drapes or other window treatments are recommended.

Remove all transitions, quarter round, baseboard molding or cove base.

10. Do not use foam under Transcend SureSet.

11. Tarkett Surestart® Underlayment and ProSheet™ Plus 3 are approved floating underlayments that can be used with Transcend SureSet.

Follow the detailed instructions found on

WOOD SUBSTRATES

1.

2.

3.

4.

5.

6.

7.

8.

Wood joist or truss systems spacing must be a maximum of 16” to 19.2” (40.6cm to 48.8cm) on center.

Subfloor panels must be dry, sturdy, smooth and dimensionally stable.

Subfloor panels must be 1” minimum thickness tongue and groove plywood. NOTE: Do not install over oriented strand board (OSB),

particle board, chipboard, lauan or composite type underlayments.

Subfloor panels must be good one side, fully sanded face with a solid core (no voids).

Subfloor panels must be exterior grade or classified as Exposure I.

All suspended wood subfloors must have at least 18” of well-ventilated air space clearance above the ground. The ground under the crawl space

shall be covered with 10 mil or thicker polyethylene sheeting to reduce moisture vapor transmission.

Offset subfloor panel joints by at least 16” so that four corners do not meet.

Subfloor panels must be securely fastened to the joists and free from spring or deflection. Deflection shall not exceed 3/64” (1.1 mm) per APA

PS 2-10 Performance Standard for Wood-Based Structural-Use Panels. If glue-nail procedures are required, use a solvent-free construction

adhesive.

Subfloor must be level within 1/8” in 8 ft. (3.1 mm in 2.4 m). Any unevenness must be sanded down or filled with a cementitious patching

compound. Any unevenness may show through to the surface and create separation of the flooring.

9.

Wood subfloors not meeting the above requirements must be covered with 1/4” minimum thickness underlayment grade plywood. ProSheet

Plus 3 or SureStart Underlayment may be used as a substitute. Follow all APA and manufacturer’s guidelines for installing underlayment

grade plywood.

Tarkett recommended underlayments include:

APA Underlayment Grade Plywood A-C, B-C or C-C Plugged

ACCU-PLY

SurePly

Page 1 of 4

TECPLY

ULAY

C.S.A. (CanPly) and Proboard

ID_20200914_EN_TRANSCEND_SURESET © 2020 Tarkett USA Inc. 09/2020

CONCRETE SUBSTRATES

1.

2.

3.

Transcend SureSet may be installed over properly constructed and prepared on-grade, above-grade, or below-grade concrete subfloors.

Concrete subfloors must be constructed as recommended by the American Concrete Institute’s ACI 302.2 Guide for Concrete Slabs that

Receive Moisture-Sensitive Flooring Materials.

Prepare concrete subfloors according to ASTM F710 Standard Practice for Preparation of Concrete Floors to Receive Resilient Flooring. The

surface of the concrete must be dry, clean, smooth, and structurally sound. The slab must be swept, damp mopped and/or vacuumed to remove

any dust. Any surface materials present such as loose paint, wax, grease, oil, adhesive residues, crayon, pen marking, etc., that may prevent

a proper adhesion or migrate to the surface of the flooring causing discoloration, must be removed. Fill and level any cracks, construction joints,

control joints, depressions, grooves or other irregularities with a high-quality, non-shrinking, latex-fortified, Portland Cement-based patching

compound.

Do not install Tarkett flooring over expansion joints or other moving joints in the substrate. These joints must be respected and should not be

filled with products that are not intended for that purpose. Contact an expansion joint cover manufacturer to meet specific flooring conditions.

Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride and ASTM F2170 Standard Test Method for Determining

Relative Humidity in Concrete Floor Slabs Using in situ Probes. Do not install Transcend SureSet if the values are greater than 9 lbs. /1000

ft²/24hrs per ASTM F1869 or 95 %RH per ASTM 2170. If the tests results exceed the limitations, the installation must not proceed until the

problem has been corrected. Tarkett does not recommend or warrant any particular product or procedure for the remediation of high moisture

in concrete substrates. There are several companies that manufacture products suitable for moisture remediation. We suggest you refer to

the current ASTM F710 Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring and ASTM F 3010 Standard Practice

for Two Component Resin Based Membrane-Forming Moisture Mitigation Systems for Use Under Resilient Flooring Systems.

4.

5.

Moisture testing of concrete subfloors must be performed in accordance with ASTM F1869 Standard Test Method for Measuring Moisture

ADDITIONAL SUBFLOOR GUIDELINES

Many installations over existing floors produce satisfactory results. However their success is dependent upon the condition of the existing floor covering.

Installing over existing flooring increases the possibility of indentations and telegraphing of the old floor. NOTE: The final decision to cover an existing

floor with new flooring rests with the flooring contractor, installer, and/or end user. Tarkett will not accept responsibility for floor failures where the condition,

type or improper preparation of the existing floor is the cause for the failure. When installing Transcend SureSet Luxury Vinyl Planks over an existing

flooring follow the recommended guidelines below.

1.

2.

Minimum temperature of the substrate must be 60˚F (15.6 ˚C). Substrate temperature should be a minimum of 5˚F higher than the dew point

temperature.

Heated flooring systems must be installed 2’’ below concrete and the operating temperature must not exceed 85º F (29.4ºC). During

installation, lower the radiant heated floor temperature to a minimum 65ºF (18.3ºC). This temperature should be maintained for at least 24

hours before and during the installation, and for 48 hours after completion of the installation. Gradually increase the temperature in increments

of 5°F (2.8°C) every 24 hours but do not exceed 85° F (29.4° C).

Residual adhesives should be mechanically removed to trace amounts and encapsulated with an approved Portland Cement-based

patching compound. Do not use chemical adhesive removers or solvents. Always follow Resilient Floor Covering Institute’s (RFCI’s)

Recommended Work Practices for Removal of Resilient Floorcoverings. Caution: Some resilient flooring and adhesives contain "asbestos

fibers" and special handling of this material is required.

Refer to ASTM F 2419 Standard Practice for Installation of Thick Poured Gypsum Concrete Underlayments and Preparation of the Surface

to Receive Resilient Flooring for guidelines when pouring gypsum underlayments or preparing for use as an underlayment under Tarkett

Transcend SureSet. Follow the gypsum underlayment manufacturer’s recommendations for proper application and preparation.

3.

4.

WARNING: Do not sand, dry sweep, dry scrape, drill, saw, bead blast or mechanically chip or pulverize existing resilient flooring, backing,

lining felt, or asphaltic “cutback” adhesive. These products may contain asbestos fibers or crystalline silica. Avoid creating dust.

Inhalation of such dust is a cancer and respiratory tract hazard. Smoking by individuals exposed to asbestos fibers greatly increases the

risk of serious bodily harm. Unless positively certain that the product is a non-asbestos containing material, you must presume it contains

asbestos. Regulations may require that the material be tested to determine asbestos content

.

SUBSTRATE PREPARATION

1.

2.

3.

4.

5.

All substrates must be dry, clean, structurally sound, smooth and free from all existing adhesive residues.

The substrate must be flat within 1/8” in 8’ (3.17 mm in 2.4 m).

Fill and level concrete cracks, construction joints, control joints, depressions, grooves and other irregularities. Use a latex fortified,

cementitious patching compound. Follow the manufactures recommendation for preparing.

Sweep and vacuum or damp mop substrate to remove all dust and debris.

Surestart & ProSheet Plus 3 can be used if needed. Follow the detailed installation instructions found at

ID_20200914_EN_TRANSCEND_SURESET Page 2 of 4 © 2020 Tarkett USA Inc. 09/2020

GETTING STARTED

1.

2.

3.

4.

5.

6.

7.

8.

9.

Install product out of multiple cartons from matching batch numbers.

Inspect all planks for visible defects and damage before and during installation. Contact your supplier immediately if any defect is found.

Do not install damaged planks. Tarkett will not accept responsibility for claims on flooring installed with obvious defects.

Transcend SureSet must be acclimated at room temperature for 48 hours prior to the installation.

Room Temperature must be maintained between 65ºF and 85ºF (18.3°C – 29.4°C) with a relative humidity between 40% to 60% for 48 hours

before and during, and 48 hours after the installation.

Remove quarter round, baseboard molding, or cove base.

Undercut doorway moldings the thickness of the flooring.

Cartons must be stored horizontally on a sturdy base at all times.

Protect carton corners from damage.

Tarkett floors are intended for indoor use only.

10. Determine in which direction the planks will be installed. To make the room appear larger or if installing in a very small room or hallway, it is

preferable to lay the planks parallel to the longest room direction.

11. Do not use foam padding under Transcend SureSet.

12. Surestart & ProSheet Plus 3 can be used if needed. Follow the detailed installation instructions found at

PLANK LAY-OUT

Square Layout-center point

To square the area to be covered, first find the center of one wall of the main rectangle of the room. Locate the same point at the direct opposite wall.

Snap a chalk line between these points. Measure this center line to find the middle of the room and mark. A right angle must be established off this

center mark. Use the following method to establish a right angle.

3-4-5 METHOD

At the center point, mark off a line across the room at exactly right angles to the first line. This may be accomplished by the 3-4-5 triangle method (Figure 1)

1.

2.

3.

4.

5.

6.

7.

8.

9.

Using a tape measure find the center of the room and mark points onto the substrate, one at each end of the room using a pencil.

Strike a chalkline on these two points.

Measure this center line to find the middle of the line and mark the substrate using a pencil.

A right angle to this centerline needs to be created by using the 3-4-5 method.

From the center point measure 3 feet down the center line and mark the substrate.

From the center point measure 4 feet out from the centerline, while slightly swinging the tape measure mark the substrate simultaneously

with a pencil.

Measure from the 3 foot mark on the center line to the 4 foot mark on the substrate.

Place a mark where the 4 foot on the floor and the 5 foot mark on the tape measure intersect.

Using a chalkline connect the center point to the intersecting mark established in step 8 above. This new line will be a right angle to the

original centerline.

Measuring from the line that is parallel to the longest wall using units of measure equal to full planks determine the size of the border planks at the wall.

Generally, the width of the border planks should be at least one half the size of a full plank. Make sure to snap a new guide line at the first row of full-

sized planks near the longest wall. Once installation begins it will be critical that the first row of planks are installed perfectly on this guideline. The

guideline is represented by the red line in the figure below.

NOTE: For larger rooms, multiples of 6-8-10 or 9-12-15 may be used to obtain greater accuracy.

After the room has been squared, determine the width of the border planks. For a consistent aesthetic, the width of the border planks should all be at least

one half the size of a full plank. This can be done simply by measuring across the room and dividing that by the width of a full plank. It will be necessary

to adjust the starting line and center point to achieve equal sized border planks. Make sure to snap new guide lines.

ID_20200914_EN_TRANSCEND_SURESET Page 3 of 4 © 2020 Tarkett USA Inc. 09/2020

INSTALLATION

1. Adhesive Application: For application in areas subject to heavy point loads, rolling loads, or topical moisture, Tarkett 975 Two-Part Urethane

Adhesive™ should be used. Follow the adhesive label instruction for proper use. Issues associated with the use of non-recommended

adhesives (including peaking, gapping, adhesion, bubbling, discoloration, indentation, etc.) are excluded from Tarkett’s limited warranty. See

complete Limited Warranty for details..

Important: To insure the best color match when installing luxury plank flooring from two or more cartons, make sure the run

numbers or date code on each carton are the same.

a.

b.

c.

d.

e.

During the installation of plank material, install product out of multiple cartons from matching batch numbers.

Square the area and establish reference points on the substrate as explained above.

Remove the release paper and use established reference points along the guideline and install the flooring material. WARNING: Once

removed, release paper may be slippery. Please keep work area clean and free of release paper.

Install planks in the same direction, in a random pattern, and offset plank end joints by a minimum 6" (15.24 cm).

Once all flooring is installed, roll floor in both directions with a 100 lbs., three-section roller. Use a small hand roller in areas that cannot be

reached with a large roller.

Following adhesive label instructions, apply the adhesive to the substrate and allow proper open time. Open and working times are

dependent on the ambient temperature, humidity, substrate porosity and temperature, and air movement. It is the installer’s

responsibility to modify the open and working time for jobsite conditions.

Remove release paper prior to laying into wet adhesive.

Planks and Tiles should be lightly butted together when placing the flooring into the adhesive.

Do not force Planks or Tiles together creating a ledge condition at the seams and corners. Sliding tiles will result in forcing the adhesive

out between the seams.

When using Tarkett 975 Two-Part Urethane Adhesive™, the installer MUST work off the flooring. Use kneeling boards to avoid

displacement of adhesive.

Periodically, lift the corner of an installed tile or plank to ensure proper transfer of adhesive.

While installing and before the adhesive dries, inspect the floor surface, especially seams, and remove any adhesive on the surface. NOTE:

Removing dried adhesive may cause irreparable damage to the flooring surface.

2.A. Installing Transcend SureSet Luxury Flooring with Pre-Applied Adhesive:

2.B. For Adhesive installations:

f.

g.

h.

i.

j.

k.

l.

m. Once all flooring is installed, roll floor in both directions with a 100 lbs., three-section roller. Use a small hand roller in areas that cannot be

reached with a large roller.

3.

n. Inspect the floor 2.5 hours later and roll again if necessary. Walk on kneeling boards to prevent adhesive displacement.

Adhesive clean up

Excess adhesive should be removed during the installation process.

975 Two-Part Urethane Adhesive

 Before the adhesive sets, remove excess adhesive from flooring and clean tools with denatured alcohol applied to a clean white cloth.

(Follow manufacturer's precautions when using denatured alcohol.)

 Do not allow adhesive to dry on the flooring surface.

 Removing dried adhesive may cause irreparable damage to the flooring surface.

4. Finishing

a.

b.

c.

d.

e.

f.

g.

Sweep up scrap material and any loose debris.

Replace all wood molding or cove base

Install appropriate transition molding at the doorways

If wet set application was used, do not replace furniture, allow foot traffic, or perform any initial maintenance for at least 72

hours.

Do not slide or roll furniture or appliances across the newly installed floor. To prevent damage, these items should be carried or slid into

place using sheets of plywood.

Use proper floor protectors under the legs of furniture.

Post installation site conditions should be controlled by HVAC and maintained between 55ºF and 95ºF (12°C and 35°C). Ambient relative

humidity should be maintained between 40% and 70%.

Tarkett North America

Technical Services Department

30000 Aurora Road

Solon, OH 44139

800.899.8916 Fax 440.632.5643

******************

ID_20200914_EN_TRANSCEND_SURESET Page 4 of 4 © 2020 Tarkett USA Inc. 09/2020


本文标签: 下载 素材 流程 作者