钻井常用词汇英汉对照表

打捞工具和常用词语

spear

side wall core

casing scraper

mill

die stamp

pin tap

box tap

packer

openner

junck sub

fishing over shot

cutter

blades

pony D.C

pup joint

slick M.D.C

fishing neck

perforate

no accident

HRS on swivel

below jar W.T

HRS on jar

seal assembly

total mud cost

centrifical pump

brine

sub sea camera

core barrel

travly block

drawworks

port

annurlar prevent

shear ram

trip tank

plug back

nozzle

打捞矛

井壁取芯

套管清刮器

磨鞋

铅印

公锥

母锥

封隔器

扩眼器

打捞杯

打捞筒

割刀

刀臂

短钻鋌

短钻杆

光滑防磁钻鋌

打捞短节

射孔

无事故

水龙头时间

震击器以下重量

震击器时间

密封总成

泥浆总消耗量

灌注泵

饱和盐

水下电视

岩芯筒

游车

钻井绞车

左舷

万能防喷器

剪切闸板

计量罐

打水泥塞

水眼

back pressure

drill out cement

explosive

squeeze cement

fast line spooler

shallow gas

panels

bridge plug

well kick and 50BBLs pits gain

kelly guard

blow out

guideline

guide rail

pick up weight

sluck off weight

rotating weight

max torque

rotating HRS

total BHA length

check crown o matic

total BHA weiht

held safety metting on rig floor

wear bushing

bridge crane of the BOP

liner

washpipe packing

sand traps

compensator

crown block

stabilizer

starboad

choke/kill line

choke manifold

gas peak

dart sub

jetter

回压

钻水泥塞

炸药

挤水泥

快绳排绳器

浅层气

面板

桥塞

井涌增量50桶

方钻杆保护接头

井喷

导向绳

导轨

上提重量

下放重量

总重量

最大扭矩

纯钻井时间

总BHA长度

检查防碰天车

总BHA重量

钻台举行安全会

抗磨补芯

BOP叉车

尾管

冲管盘根

沉沙池

补偿器

天车

扶正器

右舷

阻流和压井管线

阻流管汇

气测值

投入式止回阀

喷射冲洗器

boost line

marine swivel

prepare

break CIRC

degasser

desander

shale shaker

gas cut mud

open hole

tubing

testing

plugged bit

well off set

recover survey

rig heading

wind speed

roll

visib

钻井常用短语

加速管线

水下水龙头

准备

短时循环

除气器

除沙器

震动筛

气侵泥浆

裸眼

油管

测试

泥包钻头

井口位移

回收测斜仪

平台首向后

风速

横摇

能见度

core point

trip gas

after effect

mud cleaner

desilter

prior/before

helicopter

special tool

No.4 guide line brocken

fix

caving

D.c twist off

tugger

picth

sweel

wave

heave

dir

取芯点

后效气

后效

泥浆清洁器

除泥器

在--------之前

直升飞机

特殊工具

四号导向绳断掉

修理

垮塌

钻鋌折断

气动绞车

纵摇

升沉

方位

Last anchor on rack at 0600HR

六点最后一个锚上架

Start of contract at 1530HR

下午三点半合同开始

End of contract at 0300HR

早上三点合同结束

Rig on tow

平台拖航

Rig arrived well location at 1000HR

早上十点到达井位

Run anchors and frist anchor on bottom at 1100HR

抛锚。第一个锚11点到底

Ballast rig to 70ft draft

压载到70英尺

deballast rig

平台卸载

adjust well location with pull No .1 and No.2 anchors gain

拉1和2号锚调整井位

anchor tension test No.3 and No4-ok

1和2号锚张力试验-OK

wait slack tide

等待平潮

replace upper felly cock

替换方钻杆上阀

spuded time

开钻时间

arrived time

到达井位时间

drill 36"hole from 120m to 200m & pump 50bbls mud each connection and ream each connection once

钻36"井眼从120米至200米,每接一拄前滑眼一次并泵入50桶泥浆

open 17-1/2"hole from 250m to 500m

用17-1/2"钻头扩眼从250米至500米

leak off test at 1.2SG leak off @625psi

破裂试验.井深500米、泥浆比重1.2SG.泄漏压力为625PSI

ream hole from 450m to 500m

倒划眼从450米至500米

core drill from 1300m to 1320m

取芯钻进从1300米至1320米

collect/remove core and service core equipment

收集/甩下岩芯并包装处理

sweep hole with 100bbl HI-VIS mud

用100桶高粘泥浆清洗井

slug the hole with viscous mud

泵送一段稠泥浆进井

pump 6000stks HI-VIS mud

泵6000冲高沾泥浆

circulate and working on pipe

循环并活动钻杆

circulate and wash from 100m to 200m

循环清洗100米至200井段

circulate bottom up

循环井底出来

circulate for sample

循环取样

flow check at 2300m due to drilling break

流量观察因钻至2300米时突变

circulate for flow check

循环观察

circulate and condition mud

循环处理泥浆

reverse circulate

反循环

pooh no rotary and no drag

起钻不用转盆也不拖挂

run in W/26" x 36"BHA tag seabad @ 117m.

下26"领眼钻头和36"扩眼器至117米探海底泥面

RIH to wipe trip

下钻通井

RIH to tag top of cement at 1000m

下钻探水能面在1000米处

short trip over pull 50klbs

短起过提50千磅

make up new bottom hole assy

组合新的下部钻具

drop survey pump slug and POOH

投测打重泥浆.起钻

retrieve/return survey

回收测斜仪

inside BOP drill at casing shoe

在套管鞋进行防喷演习

POOH circ & fill annulars W/.P no good. Suspect mud problems.W/pull out every 5 Stands&fill a time ok

W/Pull out every 5 Stands&fill a time ok.

起钻灌浆不正常,怀疑是泥浆问题.每起五柱灌浆-正常

POOH due to change bit

因要换钻头所以起钻

POOH due to lost pump pressur supect washout D.C

泵压下降起钻,怀疑钻鋌刺漏

POOH due to plan change

计划改变起钻

POOH for changing bottom hole assy

起钻更换下部钻具组合

POOH wet pipe and no slug

起钻喷泥浆因没打重泥浆

POOH no rotary

起钻不转转盆

POOH and tight hole at 2500m max over pull 100klbs

起钻在2500米处遇阻最大过提100千磅

slip and cut off drill line 110feet

滑移切割钻井大绳110英尺

RIH at casing shoe then service rig

下钻至套管鞋后保养钻机

POOH @casing shoe adjust break&wait hole stabilize

起钻至套管鞋待井稳定后调整剎带

pull back 5 stands5"drillpipe and rick back derrick

起出5柱5"钻杆并立回井架

attempt retreive9-5/8"wire bushing but fail

试图回收9-5/8"抗磨补芯没成功

50bbls pit gain shut in well observe pressure 0-SIDPP 175psi SICP

50桶泥浆增量,关井后钻杆压力为0,套管压力为175psi

kill well as NHWOC,s requst

按西部公司压井程序压井

CIRC and COND . out gas show from returns max gas 1700units

循环处理泥浆,最大气测值为1700个单位

D.P hang off on h wide open choke while W.T up mud

钻杆悬挂在下闸板,循环通过全开阻流阀同时加重泥浆

moniton will on trip tank 3 bbls gain in 2HRS

在泥浆计量罐观察两小时有3桶的增量.

circulate and inspect due to pressure lost 200psi

循环检查因泵压下降200PSI

circ through choke holding 600psi back press on annulars while WT up mud

保持600PSI套管循环压力通过阻流管汇同时加重泥浆

bleed off shut in pressure 20bbls return still fiowing

卸压后有20桶回流,井内依然有回流.

stuck pipe at 2534m and work on pipe with 100kibs over pull fire jar max pull 500klbs free

500klbs free.

钻具卡在2534米上提下放活动钻具,过提100千磅震击器工作,最大上提500千磅解卡

over pull 450klbs the D.P twist off and lost weight 280 klbs total 2999m in hole

过提450千磅钻杆折断,失去悬重280千磅落鱼总长为2999米

weld guide shoe onto 8-1/8" overshot

焊接8-1/8"打捞筒和引鞋

rig up pin tap RIH to top of fish and engage the fish -no succss and POOH

组合公锥下钻打捞落鱼不成功,起钻

work overshot onto fish w/max overpull 50klbs free & POOH

打捞落鱼过提50千磅活动&起钻

observe well on trip static

倒向泥浆计量罐观察井内稳定

jump ROV and work for guide problems

下放潜水器帮助处理导向绳问题

attempt to re-establish guideline No.4

试图回接4号导向绳

ballast rig and pull anchors stable into 36"hole

压船并拉锚对36"井眼

rig up run9-5/8"casing tools and running 9-5/8"casing

安装下9-5/8"套管的工具和下9-5/8"套管

pick up 9-5/8"casing hanger and R/tool mack up and torque up lay out same

组合9-5/8"套管头和送入工具连接并上好扭矩然后甩下

pick up casing shoe jiont and float M/U inspect ok RIH

拉起套管鞋和浮阀单根并连接,检查好后下入井

run stinger string

下内管柱

run 9-5/8" casing fill mud for each 10 joints

每下10根9-5/8"套管灌满泥浆一次

P/U and M/U 9-5/8"casing head joint continue RIH W/5"drillpipe

接好9-5/8"套管头,继续用5"钻杆送入井

hanger off 9-5/8"casing

悬挂9-5/8"套管

M/U cment line to the unit and pressure test same 2000psi-ok

连接水泥管线到固井泵并压力测试管线至2000psi-OK

pressure test casing 2000psi hold 10mins-ok

压力测试套管至2000PSI并稳压10分钟-OK

line up to cement unit & set cement plug as per phillips programes

管线连接到固井装置&按phillips(作业者)程序打水泥塞

back off running tools and POOH then break lay down same

倒开送入工具起出卸掉甩下

rig up run / pull B.O.P stack

准备下/起防喷器组

run TGB W/rig camera to on t W/cemera appeared all e R/tool

用水下电视协助下永久性导向架。座在海底并检查合格后倒出送入工具

inspect and repair B.O.P stack

检查和修理防喷器组

S.C.R about choke line 100psi with 30 spm and No.1 pump

阻流管线的压力降是100PSI。泵速为此30冲/分钟,泥浆比重为1.26SG用一号泵

B.O.P test as phillips,s request -ok.

按PHILLIPS的要求进行防喷器组测试

pressure test inside BOP gray valve and kelly upper/lower valve -ok

压力测试方钻杆上下阀、钻杆内防喷器阀门-OK

inspect and repair yllow / blue pod function test BOP -ok

检查和修理黄/蓝盒并对防喷器组进行功能测试-OK

crew working on moon pool and spider deck

钻井班在月亮池和完井甲板工作

pick up 3 joint risers and R/tool make up install L.M.R.P

组合三根隔水管和送入工具并连接好插入总成.

run stack slip pressure testn choke/kill line each 3 joint riser

下防喷器组和隔水管并每三根试压一次

pick up slip up choke/kill goosnecks install rucker ring

下伸缩节及组装阻流/压井的鹅颈管和支撑环节

jump R.O.V to watch and check well head well

放潜水器去观察井口状况良好

land stack . Lock connector check with 30 klbs over pull -ok

座封和连接井口并关连接器后过提30千镑-OK

scope out slip jt pick up diverter and install same rig down BOP running tools

拉出伸缩节内筒坐转喷器以及甩下所有防喷器组的送入工具

pull out and BOPstack.

起出转喷器.伸缩节.隔水管和防喷器组

rotary torque 250amps on bottom 100amps off bottom

钻具在井底钻盆扭矩为避免250安培,离开井底为100安培.

No1pump for drilling and No2pump use for boost riser

一号泵钻进,二号泵导向隔水管,增加隔水管处的上返速度.

rig evacuat for typhoon

平台撤离防台风

first chopper land rig at pm1700HR

下午1700第一班飞机到平台

crew come back form SAN YA by nanhai211 boat at am0700HR

早上0700人员从三亚乘南海211船回平台.

常用英文缩略语

L/D------------lay down 甩下

BHA-----------bottom hole assembly 下部钻具组合

L/O------------lay out甩出

L.M.R.P-------lower marining riser package插入总成

M/U-----------make up上紧

SIDPP---------shut in drillpipe pressure关井钻杆压力

HWDP-------------hight weight drill pipe加重钻杆

T.G.B---------------temporary guide base临时基板

P.G.B---------------permanent guide base永久性基板

AFT----------------after船首

FWD---------------forward船尾

PPG----------------pound per gallon磅/嗧

P/U------------pick up上提

S/OFF---------sluck off下放

SICP-----------shut in casing pressure关井架套压

CIRC-----------circulate循环

POOH----------pull out of hole起钻

COND----------condition调整

RIH-------------run into hole下钻

CONT----------continue继续

RTTS-----------retrievable test treat squeeze packer可回收的测试封隔器

WT-------------weight重量

BOP------------blow out preventor防喷器组

X.O-------------crossover配合接头

W.O.O----------wait on order等待命令

D.S-------------dart sub投入式止回阀接头

W.O.W---------wait on weather等待天气

F.S--------------float sub浮阀接头

W.O.C----------wait on cement候凝

B.S--------------bit sub钻头接头

SIPT------------shut in pressure关井求压

SSTT------------subsea test tree水下试油树

assy-------------assembly总承

cag--------------casing套管

cmt--------------cement水泥

conn-------------connection连接

IF---------------inner flat内平

FH--------------full hole贯眼

REG-------------regular正规

S.W-------------sea water海水

F.W-------------fresh water淡水

temp-------------temperaure温度

Derrick井架

Crown block天车

Drilling line大绳

Rig floor钻台

Monkey board二层台

Traveling block游车

SG-----------------specific gravity克/立方厘米

TBG---------------tubing油管

pres----------------pressure压力

AFT.----------------after在。。。。。后

surfaceline地面管线

TT---------------total总计

T.D--------------total depth总井深

-----------trip tank计量罐

D.P--------------drill pipe钻杆

D.C--------------drill collar钻鋌

WOB------------weight on bit钻压

RPM-------------rate per minute转/分钟

SPM-------------stroke per minute冲/分钟

GPM-------------gallon per minute嗧/分钟

hr----------------hour小时

min--------------minute分钟

sec--------------second秒

in----------------inch英寸

ft----------------feet英尺

gal---------------gallon嗧

bbl---------------barrels桶

lb----------------pound磅

klb---------------kilopound千磅

jti----------------joints根数

bttms------------bottoms井底

B/U-------------bottom up井底返上

TQ--------------torque扭矩

ROT/TQ--------rotary torque转盆扭矩

STKS-----------stroks冲数

V/V-------------valve阀

Top drive顶驱

Shackle卡环

Elevator吊卡

Spud in开钻

Spud mud开钻泥浆

Safety slips安全卡瓦

Sub/adapter接头/短节

Kelly方钻杆

Drill collar钻铤

Drill pipe钻杆

Drill string钻柱

Lay down the drill pipe甩钻杆

Jar震击器

Shock absorber减震器

Rat hole大鼠洞

Mouse hole小鼠洞

Fishing tool打捞工具

Fishing spear打捞矛

Pin公扣

Box母扣

Safety joint安全接头

Safety belt安全带

Safety cap/hard hat/helmet安全帽

Boots工鞋

Flange 法兰

Back-up tongs内钳

Lead tongs外钳

Pneumatic tongs气动大钳

Hydraulic tongs液压大钳

Driller room司钻房

Assistant driller副钻

Floorman钻工

Rig钻机

Wellhead井口

Bell Nipple井口喇叭口

Fish井下落物

Single(pipe)/joint单根

Threbble/stand一柱

Breaking down/lay down甩单根

Make a connection接单根

Pneumatic draw works气动绞车

Basket吊笼

Sling绳套

Loosening松开

Tightening紧固

Change shift换班

Tubing hanger油管挂

Blowout preventer(BOP)防喷器

Accumulator储能器

Agitator 搅拌器

Ato-muffler消音器

Clutch离合器

Heavy weight drill pipe(HWDP)加重钻杆

Hydraulic valve液压阀

Chock line阻流管线

Well control manifold井控管汇

Pressure relief valve压力释放阀

Directional well定向井

Conductor隔水套管

Casing套管

Tubing油管

Liner 尾管

Run casing下套管

Casing size套管尺寸

Surface casing表层套管

Casing shoe套管靴

Casing scraper刮管器

Cementing pump固井泵

Cementing line固井管线

Cementing head水泥头

Squeeze cement挤水泥

Wait on cementing候凝

Cement plug水泥塞

Bridge plug桥塞

Christmas tree采油树

Spanner扳手

Hammer锤子

Screwdriver改锥

Tighten the screw上紧螺丝

Loosen the screw松开螺丝

Pressure testing试压

Leak漏泄

Leak off test地漏试验

Formation integrity test地漏试验

No leaking不漏

Electric welding电焊

Gas welding气焊

Sealing ring密封圈

Sidewall井壁

Get stuck/sticking卡钻

Meet sticking/stick pipe遇卡

Free stick解卡

Meet resistance遇阻

Mud circulation循环泥浆

Kick井涌

Blowout/gush井喷

Lost circulation/lost returns井漏

Plugging/sealing堵漏

Lost circulation material堵漏材料

Lost circulation additives/plugging agent堵漏剂

Mud pit泥浆池

HI-VIS sweep稠泥浆

Mud additive泥浆添加剂

Packer封隔器

Bit钻头

Centralizer/stabilizer扶正器

Cuttings岩屑

Reaming/redressing划眼

Reverse reaming/back reaming/up reaming倒划眼

Make-up of string钻具组合

Build the pressure憋压

Waiting on cement候凝

Slurry水泥浆

Logging电测

Wiper trip通井

Coring取芯

Coring tool取芯工具

Coring bit取芯钻头

Formation地层

Kill line压井管线

Choke line manifold阻流管汇

Trip in hole(TIH)/running in hole(RIH)/go in hole(GIH)下钻

Pull out of the hole(POOH)起钻

Bottom hole assembly(BHA)井底钻具组合

Short trip短起

Reverse circulation反循环

Open the well for gushing放喷

Burner燃烧器

Hydrogen sulfide/hepatic gas硫化氢

Mask防毒面具

Measuring tank/trip tank计量罐

Separator分离器

Desander/sand separator除沙器

Shale shaker震动筛

Mud pump/slush pump/drilling pump泥浆泵

Piston活塞

Liner钢套

Valve阀门

High pressure pipe高压管线

Rush to repair抢修

Viscosifier增粘剂

Diluent稀释剂

Stabilizer稳定剂

Emulsifying agent乳化剂

Disperse agent消油剂

Caustic soda烧碱

Gravity比重

Mud engineer泥浆工程师

Geologic engineer地质师

Mechanical engineer机械师

Drilling engineer钻井工程师

Electrical engineer电器师

Supervisor监督

Captain/shipmaster船长

Mudman泥浆工

Start pumping开泵

Stop pumping停泵

Pipe tongs/pipe spanner管钳

Thread protector护丝

Hose 软管

Hook 大钩

Ball valve/globe valve球阀

Hydrogen氢气

Nitrogen氮气

Oxygen氧气

Overload过载

Hatch door舱门

Anchor machine锚机

Mooring rope带缆绳

Anchor chain锚链

Fire extinguisher灭火器

Fire hydrant消防栓

Water tap水龙带

Deck甲板

Draft line吃水线

Helideck飞机甲板

Portable water/fresh water淡水

Drill water钻井水

Ventilation通风设备

Thermometer温度计

Anemometer风速仪

Barometer气压仪

Crane boom吊车爬杆

Transformer变压器

Life boat救生艇

Life jacket救生衣

Life buoy救生圈

Survival suit救生服

Safety net安全网

Foam fire extinguishing system泡沫灭火系统

Co2 hand portable fire extinguisher手提式CO2灭火机

Portable dry powder fire extinguish手提式干粉灭火机

Fireman’s suit消防服

Stretcher担架

First aid kit急救箱

First aid equipment急救设备

Standby boat值班船

Towing line拖缆

Jack house升降室

Condenser冷凝器

Fire drill消防演习

BOP drill防喷器演习

Abandon drill逃生演习

Fire alarm system火灾报警系统

Variable load可变载荷

Paint油漆

Crane吊车

Brush刷子

Welding rod电焊条

Remove rust除锈

Unload卸载

Drop anchor抛锚

Gesture手势

Signal信号

Range light桅灯

Lamp signal灯语

Flag signal旗语

Broadcast广播

Barite重晶石

Bentonite土粉

Cement水泥

Tray托盘

Rack架

Bundle捆

Prevent pollution防污

Mop拖布

Rag 擦布

Tie up带缆

Cast off解缆

Diesel柴油

Generator发电机

Motor电机

Air condition空调

Air compressor空压机

Fresh water maker造水机

Emergency generator应急发电机

Fire pump消防泵

Fuel pump燃油泵

Mud cycle pump泥浆循环泵

Distribution room配电间

Submersible pump潜水泵

Boiler锅炉

Ground connection接地

Short circuit短路

Air button空气开关

Electric shock触电

Pliers老虎钳

Keep away走开

Cubic meter立方

Square meter平方

Water tank水舱

Oil tank油舱

Ballast tank压


本文标签: 泥浆 钻杆 套管 起钻 循环